DEYE banner

product

DEYE single phase European version of energy storage inverter

Short Description:

This is currently the most popular hybrid inverter in the European market, he can be connected to the grid operation, or not connected to the grid operation. With six charging and discharging periods, it can also accept the energy stored by a diesel generator to keep your home powered for 24 hours a day.

Hybrid Inverter SUN- 12 / 14 / 16 K-SG01LP1-EU

Product Detail

Application

Servive

Certificate & Shipping

Product Tags

Features

sdxrtfd (2)

Product Details

sdxrtfd (3)
sdxrtfd (4)
sdxrtfd (5)
sdxrtfd (6)

Product parameters

General Data
Operating Temperature Range(℃) -40~60℃,>45℃ derating
Cooling Smart cooling
Noise (dB) <30 dB
Communication with BMS RS485;CAN
Weight(kg) 48.5
Size(mm) 464Wx798.4Hx300D
Protection degree IP65
Installation style Wall-mounted
Warranty 5 years
Efficiency
Max.Efficiency 97.60%
Euro Efficiency 96.50%
MPPT Efficiency 99.90%
Certifications and Standards
Grid Regulation CEI 0-21,VDE-AR-N 4105 ,NRS 097,IEC 62116,IEC 61727,G99,G98,VDE 0126-1-1,RD1699,C10-11
Safety EMC/standard IEC/EN 61000-6-1/2/3/4,IEC/EN62109-1,IEC/EN62109-2

  • Previous:
  • Next:

  • sdxrtfd (7)

    sredf (5)

    OEM/ODM

    service-2

    Product label

    Longrun prides itself on helping customers enhance their private label product lines.Whether you need help creating the right formula or have a range of products you want to compete with, we can help you deliver high-quality products every time.

    service-3

    Packing of contract

    Longrun can also be an extension of your company If you already have an amazing product but can’t package and ship it exactly as you want.We offer contract packaging that can easily fill gaps in areas of your business that you cannot currently complete

    FAQS

    1.Can I have my own custom design for products and packaging?

    Yes, you can use OEM according to your needs. Just give us the artwork you designed

    2.What’s the lead time for mass production?

    – It depends on the actual situation. 48V100ah LFP battery pack,3-7 days with stock, if without stock, that will be depends on your order quantity, normally needs 20-25 days.

    3.How’s your quality control system?

    – 100% PCM test by IQC.

    – 100% Capacity test by OQC.

    4.How’s the lead time and services?

    – Fast Delivery in 10 days.

    – 8h response & 48h solution.

    At present, the company is vigorously expanding its overseas market and making a global layout. In the next three years, we are committed to becoming one of the top ten new energy battery export enterprises in China, serving the world with high-quality products, and achieving win-win results with more customers.

    cert-1cert-2

    Delivery within 48 hours

    FAQS

    1.Can I have my own custom design for products and packaging?

    Yes, you can use OEM according to your needs. Just give us the artwork you designed

    2.What’s the lead time for mass production?

    – It depends on the actual situation. 48V100ah LFP battery pack,3-7 days with stock, if without stock, that will be depends on your order quantity, normally needs 20-25 days.

    3.How’s your quality control system?

    – 100% PCM test by IQC.

    – 100% Capacity test by OQC.

    4.How’s the lead time and services?

    – Fast Delivery in 10 days.

    – 8h response & 48h solution.

  • Write your message here and send it to us