DEYE single phase European version of energy storage inverter
Product Details
Product parameters
General Data | |
Operating Temperature Range(℃) | -40~60℃,>45℃ derating |
Cooling | Smart cooling |
Noise (dB) | <30 dB |
Communication with BMS | RS485;CAN |
Weight(kg) | 48.5 |
Size(mm) | 464Wx798.4Hx300D |
Protection degree | IP65 |
Installation style | Wall-mounted |
Warranty | 5 years |
Efficiency | |
Max.Efficiency | 97.60% |
Euro Efficiency | 96.50% |
MPPT Efficiency | 99.90% |
Certifications and Standards | |
Grid Regulation | CEI 0-21,VDE-AR-N 4105 ,NRS 097,IEC 62116,IEC 61727,G99,G98,VDE 0126-1-1,RD1699,C10-11 |
Safety EMC/standard | IEC/EN 61000-6-1/2/3/4,IEC/EN62109-1,IEC/EN62109-2 |
OEM/ODM
Product label
Longrun prides itself on helping customers enhance their private label product lines.Whether you need help creating the right formula or have a range of products you want to compete with, we can help you deliver high-quality products every time.
Packing of contract
Longrun can also be an extension of your company If you already have an amazing product but can’t package and ship it exactly as you want.We offer contract packaging that can easily fill gaps in areas of your business that you cannot currently complete
FAQS
1.Can I have my own custom design for products and packaging?
Yes, you can use OEM according to your needs. Just give us the artwork you designed
2.What’s the lead time for mass production?
– It depends on the actual situation. 48V100ah LFP battery pack,3-7 days with stock, if without stock, that will be depends on your order quantity, normally needs 20-25 days.
3.How’s your quality control system?
– 100% PCM test by IQC.
– 100% Capacity test by OQC.
4.How’s the lead time and services?
– Fast Delivery in 10 days.
– 8h response & 48h solution.
At present, the company is vigorously expanding its overseas market and making a global layout. In the next three years, we are committed to becoming one of the top ten new energy battery export enterprises in China, serving the world with high-quality products, and achieving win-win results with more customers.
Delivery within 48 hours
FAQS
1.Can I have my own custom design for products and packaging?
Yes, you can use OEM according to your needs. Just give us the artwork you designed
2.What’s the lead time for mass production?
– It depends on the actual situation. 48V100ah LFP battery pack,3-7 days with stock, if without stock, that will be depends on your order quantity, normally needs 20-25 days.
3.How’s your quality control system?
– 100% PCM test by IQC.
– 100% Capacity test by OQC.
4.How’s the lead time and services?
– Fast Delivery in 10 days.
– 8h response & 48h solution.